POOR WEATHER & MAJOR TIME CONSTRAINTS NO
PROBLEM FOR TP ENGINEERING
“TP exceeded project completion date”

Mechanically challenging material handling equipment installed at Viterra NZ Ltd

TP Engineering Ltd were contracted to manufacture some of the components and full installation of the material handling equipment shipped from Holland for Viterra’s feed mill. The animal food processing equipment included a 30m long bucket elevator, 101 storage hoppers, chain conveyor, storage tanks, grinders, presses, augers, platforms, handrails, micro dosing system, ducting, chimneys, bag houses, textured feed system, bagging unit, stairwells, pneumatic slide gates and explosion chutes. The TP engineers were also responsible for the build of the structural building and commissioning.

Sixty engineers on the project

At the peak there were 60 TP Engineering Ltd Employees on site and in our workshop and mechanical, electrical and civil work carried out concurrently. This major multi skilled plant installation was successfully achieved in an incredibly short time frame spanning just 8 months, utilising our own riggers, scaffolders, fitter/welders, pipe fabricators, fitter turners, project engineers throughout this materials handling equipment project.

Zero harm with 65000 man hours

The project achieved all safety targets as the entire work force embraced the safety objective resulting in zero harm despite a massive 65,000 man hours on the project.

The Challenge for TP Engineers

Weather conditions and working at height to meet the target milestone was only achievable by forward planning and co-ordination with all other trades and TP Engineering Ltd employees to meet and exceed completion dates.

View more projects
See our latest Projects
You may also be interested in Projects or
Services
Nuplex1 Nuplex1 Nuplex1 Nuplex1 Nuplex1
Nuplex1 Nuplex1 Nuplex1 Nuplex1 Nuplex1
 
Deliver a successful project
Talk to us before your project start
TP’s highly skilled team of General Engineers have completed many difficult projects on time and within budget.
Pipe on truck Pressure vessel
Save time and avoid issues with:
We’ll visit your site and discuss the project.
 
Our customer care commitment
  • Good communication
  • Set and meet expectations
  • Be clear and accessible
Illustrated by our many happy clients who come back to us again and again
As a responsible employer, TP Engineering is proud to be a member of these associations
ERMA approved stationary container fabricator for dangerous goods
TP Engineering, 256 Roscommon Road, Wiri, Auckland, NZ. P O Box 97562, Manukau City 2241 ph. +64 9 269 8490
Home | About us | Our Services | Projects  | Stainless Steel Fabrication | Material handling equipment  | Our Team | Contact us